Google reviews
What our clients say
Most relevant first, as ranked by Google. Reviews from Google Maps.
What is a Tree Management Plan?
A whole-of-site record of every tree on the property — what it is, what condition it is in, what it needs, when it needs it, and what that will cost — built into a prioritised works programme running five years out. It is a planning document rather than a report on a problem, and it is the one piece of arboricultural work that turns an open-ended liability into a budget line you can defend.
The inspection covers the whole population, not a sample. Every tree is located, tagged, assessed and recorded, which is what makes the output usable as an asset register rather than an opinion. From there the works fall out: what is urgent, what is next year, what is being monitored, and what is being planned for because it will not be there in fifteen years.
How it differs from a tree risk assessment
A tree risk assessment answers a question about the trees you are already worried about: how likely is this to fail, what would it hit, and what should be done about it. It is scoped to specific trees and it is usually commissioned because something has prompted it — a limb came down, an insurer asked, a neighbour complained.
A management plan covers every tree on the site whether or not anybody is worried about it, and adds the two things a risk assessment does not carry: cost and timing. Risk is one column in it. The rest is the programme — what gets done in which year, at what price, and what the site looks like at the end of it.
The practical test is what you are trying to produce. If you need an answer about particular trees, that is a risk assessment. If you need a number to put in a budget submission and a defence for how it was arrived at, that is a management plan.
Do I need a tree management plan?
The trigger is a position you are in rather than the kind of organisation you are. Where any of these apply, the trees are already a liability sitting on your books without a number next to them:
-
You have a duty of care over trees
The public or occupants use the areas under trees you’re responsible for.
-
There’s no record of your trees
Multiple trees with no record of their condition, or an ageing tree population with no succession plan.
-
You need defensible figures
Tree spend is unpredictable, or an insurer, board or budget submission needs to know the tree liability.
What a tree management plan includes
A tree management plan records every tree on the site and turns that record into a costed programme you can budget against. Here’s what you can expect to see:
-
Tree inventory with GPS locations
Full tree inventory with tagging and GPS location
-
Condition and structure of every tree
Condition and structural assessment of every tree
-
Risk profile and priority trees
Risk profile identifying priority trees
-
Five-year costed works programme
Costed works programme prioritised over a five-year horizon
-
Species and succession planning
Species and succession planning for ageing populations
-
Annual inspections and budget forecast
Annual inspection schedule and budget forecast
How to get a Tree Management Plan
To get a tree management plan you should engage an AQF Level 5 consulting arborist with experience managing whole tree populations, not just single trees. Start by telling the arborist how big the site is, how many trees are on it, and what your budget is as tree management plans can vary in detail based on the customer’s budget and requirements.
Get a FREE Quote
Not sure where to start?
Not sure whether you need a tree management plan? Book a consultation so we can discuss your site, your trees and what you need to plan for. You’ll get a straight answer and a fixed quote.
Why reactive tree management costs more
Nobody plans to manage trees reactively. It happens because there is no record, so nothing surfaces until it fails — and by then the cheap options have expired. Four separate costs come out of that, and only the first one is obvious.
Emergency callout rates vs programmed works
The same tree costs materially more to deal with as an emergency than as a scheduled job, and it is worth being clear about why, because the gap is not a surcharge somebody invented. A programmed removal is booked weeks out, run in normal hours, with the right machine brought to a site that has been set up for it. An emergency is the opposite of every one of those things.
After-hours labour is the smallest part of it. Traffic management arranged at no notice, a crane or EWP hired same-day at whatever rate is available, and a crew pulled off another job all price at a premium. Then the work itself is harder: a failed tree has to be dismantled out of whatever it has landed on, under load, often over a structure or a road, rather than felled into open ground. Add make-safe works, debris clearance and any damage to what it hit, and the invoice is a different order of magnitude to the scheduled version of the same job.
The programme converts that into a known figure agreed in advance. Price a scheduled removal for the trees on your site and you have the number that goes in the budget — the emergency version of it is the number you avoid.
Failures that were predictable and preventable
Most tree failures are not bolts from the blue. Included bark at a major union, a developing cavity, a fungal fruiting body at the base, deadwood over a car park, a lean that has changed — these are visible to somebody looking for them, often years before anything comes down. The failure is the end of a process, not an event.
What reactive management misses is the window in the middle, where a few hundred dollars of reduction pruning or a monitoring interval would have closed the issue out. Nobody is looking, so the window passes unused, and the first time the tree is professionally assessed is after it has already failed.
Trees that could have been retained if treated earlier
This is the cost nobody puts a number on, and it is usually the biggest. A mature tree in decline is frequently recoverable — decompaction, irrigation, mulching, root zone protection, a pest or pathogen dealt with before it takes the canopy. Caught late enough, none of that works and the only option left is removal.
Replacing a semi-mature tree is not a like-for-like transaction. You pay for the removal, then advanced stock, then planting and establishment watering, and you still wait fifteen to twenty years for anything resembling what was there. On a school campus or a body corporate frontage, the amenity that disappears in an afternoon took decades to grow and is the thing residents and parents actually notice.
Duty of care exposure with no documented programme
The exposure that only shows up once. Where a tree causes injury or damage, the question is not whether you knew it was dangerous — it is whether a reasonable occupier in your position ought to have known. Having no record at all is not a defence to that, and in practice it is close to the opposite: it evidences that nobody was looking.
A documented programme answers the question directly. The tree was inspected, here is what was found, here is the interval it was on, here is what was scheduled and when. That is a systematic approach to duty of care rather than an ad hoc one, and it is the record your insurer, your board and your lawyer will all ask for in the same week.
What you receive
Format matters on this one, because the plan is a working document for somebody else's job rather than something to file. You get all of it in a form you can actually use:
- Tree inventory as a spreadsheet — Excel or CSV, one row per tree, filterable and sortable. This is the file a facilities manager works from, drops into an asset register, or hands to a contractor when works go out.
- Tagged and GPS-located trees — durable numbered tags on the trees themselves and coordinates in the spreadsheet, so the tree in row 147 is findable by somebody who has never been on site.
- Per-tree condition record — species, dimensions, health, structure, useful life expectancy, risk rating, and the works recommended with their timing.
- Prioritised works programme with costs by year — the budget document. Every recommended work costed and allocated to a year, totalled so a line can be lifted straight into a submission.
- Annual inspection schedule — which trees are on which interval and when each is next due, so the monitoring runs itself.
- Plan drawings — the site plan with every tree numbered and located, as PDF for circulating and reporting.
The written report sits over the top of all of it — methodology, findings, the population overview, and the reasoning behind the programme. That is the part that goes to a board or an insurer. The spreadsheet is the part that gets used every week.
The five-year works programme
This is the deliverable you are actually buying. The inventory is the evidence base; the programme is what you do with it, and it is built to survive a budget process rather than to read well.
How works are prioritised
Works are ordered by consequence rather than by condition, which is a distinction that changes the list. A structurally poor tree in the middle of a paddock is a low priority; a moderately defective tree over a play area or a car park is not. Risk rating, what sits beneath the tree, and how often people are under it all feed the ordering.
That produces four practical bands: works that need doing now, works scheduled into a specific year, trees on a monitoring interval with no work required yet, and trees with nothing to do at all. The last band matters more than it sounds — knowing which trees you can stop thinking about is a real part of the value.
Costing and budget forecasting by year
Every recommended work carries an estimated cost, and those costs are totalled by year across the five-year horizon. What comes out is a forecast line: this is the tree budget for the coming year, here is what it buys, and here is what the following four look like.
The programme is deliberately built to be shifted. Where a year comes in over budget, the report shows what can safely move and what cannot, so a deferral is a documented decision with reasoning attached rather than a gap in the record. That distinction matters if a deferred tree later fails.
Species and succession planning
Tree populations planted at the same time decline at the same time, which is the problem on most school campuses and older estates — forty trees all planted in one landscaping round, all reaching the end of their useful life inside the same decade. Handled reactively that is a cliff. Handled in a programme it is a staged replacement.
The plan carries a useful life expectancy for each tree and uses it to stage replacement planting so new stock is establishing before the old canopy comes out. Species selection is part of it: what suits the position, the soil, the climate it will actually live in, and what the site can maintain.
Annual inspection schedule
Not every tree needs looking at every year, and inspecting all of them annually is a waste of money. The plan sets intervals against risk — a high-consequence tree with a known defect on a short cycle, a sound tree in a low-occupancy corner on a long one — and schedules them so the load is even across years.
The schedule is what makes the programme a live system rather than a document. It also gives you a straightforward answer to when this tree was last inspected, which is the question that gets asked after something goes wrong.
Annual review and updating
A management plan is a snapshot of a living population, and populations move. Trees grow, defects develop, works get done, storms pass through, and a plan that is never revisited quietly stops describing the site it was written for.
That matters most for the thing the plan is meant to do. A current programme evidences an ongoing system of inspection and works. A four-year-old document with no review behind it evidences that somebody commissioned a report once, which is a weaker position than it looks — arguably weaker than having nothing, because it shows the risk was identified and then left.
Because the inventory already exists, a review is a fraction of the original work. Annual reviews are quoted at roughly 30–40% of the initial plan fee, depending on how much has changed and whether the works programme needs re-costing. It is priced and scheduled at the same time as the plan, so it lands in the same budget cycle every year rather than being remembered late.
Tree management plan cost
A tree management plan starts at $1,320 including GST. Unlike the report services there is no single typical job, because a childcare centre with eleven trees and a school campus with three hundred are the same document at very different scales — so every plan is quoted after a short scoping conversation rather than off a price list.
What drives the figure is the number of trees, the size and access of the site, how much of it is walkable versus needing vehicle access, and whether tagging and GPS location are included or an existing inventory can be built on. Sites with prior records are cheaper, and a plan that only needs the programme rebuilt is cheaper again.
Standards and methodology applied
Reports are prepared against the standards and instruments assessors expect to see referenced.
- ISA Tree Risk Assessment Qualification (TRAQ) methodology
- VALID Tree Risk-Benefit Assessment
- AS 4373-2007 Pruning of amenity trees
- Useful life expectancy (ULE) assessment
- The vegetation protection instruments of the relevant council
Tree Management Plan questions
Why do we need a plan instead of just calling someone when there is a problem?
Because reactive tree management is more expensive and less defensible. A plan converts unpredictable emergency spending into a forecast budget line, and it evidences a systematic approach to duty of care rather than an ad hoc one. The cost difference is not marginal — an emergency job is booked at no notice, run at whatever rate is available, and frequently involves dismantling a failed tree out of whatever it landed on rather than removing a standing one.
How long does a management plan stay current?
The inventory and works programme are built on a five-year horizon with annual review. Trees change, so a plan that is never revisited stops being a defence — and a stale plan is arguably a worse position than no plan, because it shows the risk was identified and then left. The annual review re-inspects the population, closes out completed works and rolls the programme forward a year, so you always have five years of forecast in front of you.
How many trees does a site need before a plan is worth it?
There is no threshold, but the honest answer is that below about fifteen or twenty trees you are usually better served by a tree risk assessment covering the ones that matter. The plan earns its cost where there are enough trees that nobody can hold the site in their head, where spend is unpredictable, or where somebody — a board, an insurer, a regulator — will eventually ask what your position is. A ten-tree site with a genuine duty of care can still justify one; a forty-tree site almost always does.
Can you work to our existing budget?
Yes, and it is a sensible way to run it. Tell us the figure and the programme is built around it — what that budget buys in year one, what it defers, and what the consequence of deferring each item is. What will not happen is works being quietly dropped off the list to make the number fit. Anything that should be done and is not funded stays in the report as a documented deferral with reasoning attached, which is both more useful to you and a far better position if a deferred tree later fails.
Do you carry out the works in the programme as well?
No. This practice does not sell tree removal or pruning, which is the entire reason the programme is worth anything — there is no version of it that recommends more work because the work is ours to do. The costs in the plan are estimates of what the works should cost you, and they are the figures to hold contractor quotes against. Where it helps, the programme can be packaged so it goes out to tender as a defined scope rather than as a conversation.
How does this help with our insurance or board reporting?
Both ask the same underlying question: what is the exposure and what is being done about it. The plan answers it in one document — the population, the risk profile, what is scheduled, what it costs, and the inspection intervals it all runs on. For board reporting the written report and the annual summary are the usable parts; for insurers it is the evidence of a systematic inspection regime rather than an ad hoc one. It is worth sending a copy to your insurer when it is done rather than holding it until a claim.
What happens if a tree fails after the plan is done?
Trees fail, including trees assessed as sound — no assessment makes a tree safe and nobody credible claims otherwise. What the plan does is establish what was known, when it was inspected, what interval it was on and what was scheduled. If the tree was identified as a risk and works were programmed, you have a documented position. If it was assessed as sound and failed anyway, you have evidence that a qualified assessment was carried out on a reasonable interval, which is the standard a duty of care is measured against. Either way the answer exists in writing rather than having to be reconstructed afterwards.
Can the plan be split across multiple sites?
Yes, and portfolios are a common case — a school with several campuses, a body corporate with multiple buildings, an operator with sites across several councils. Each site gets its own inventory and works programme so it can be managed and budgeted independently, with a consolidated view across the portfolio for whoever holds the total number. Sites in different council areas have their permit requirements flagged separately, since what needs approval changes at the boundary.
Tree management plans across South East Queensland
Tree management plans are prepared across Brisbane, Moreton Bay, the Sunshine Coast, the Gold Coast, Redland, Logan and Ipswich, for single sites and for portfolios spread across several of them. No council requires a management plan — this is a duty of care and budgeting document rather than an approval one — but the vegetation rules where each site sits still govern which works in the programme need a permit before they can be carried out, and the programme is written with that already factored in.
Where a portfolio crosses council boundaries, the works programme flags which items are permit-dependent and where. The rules for each council are set out separately.
Get started
Request a quote for a tree management plan
Tell us roughly how big the site is, how many trees you think are on it, and when your budget is set — that last one matters more than urgency here, because the point of the plan is to have defensible figures ready before the submission rather than after it. An approximate tree count is fine; nobody expects you to have counted.
- No obligation and no pressure
- Honest answer if you don't need the report
- Fixed price, quoted before any work begins
Enquire — Tree Management Plan
Tell us what you need and you will hear back same business day. No obligation, and a fixed price before any work starts.
Related
Often needed alongside this
Tree Risk Assessment
A structured evaluation of how likely a tree is to fail, what it would hit, and what the consequences would be — documented so your decision is defensible.
Read more →Tree Health & Disease Treatment
Most declining trees are a soil problem wearing a canopy symptom. This is the diagnostic work that finds the actual cause before you spend money treating the wrong thing.
Read more →Tree Valuation
What a tree is actually worth, calculated by a recognised method — for insurance, compensation, damage claims or council offset requirements.
Read more →Not sure what you need?
Describe the situation and you will get a straight answer about which report your council actually requires — including when the answer is that you do not need one.